Project organization chart

For every project each department follows a very precise competence sequence.


In our group design plays an absolutely dominant role: our staff is composed by mechanical, electronic and process engineers who are all excited about the greatest objective of the company: growing.

Already from the first 90s our engineering department was equipped with sophisticated analysis and 3D modelling softwares in order to show the process plant to our customer before its realization.


Marketing is the first step to cooperate with the customer: TECNinox supports him during the whole life of a plant.

1 - Conceptual & basic design

Based on your URS, the project is formulated to meet your requirements.

2 - Detailed design

Detailed specifications, as well as shop and installation drawings are developed.

3 - Fabrication

Fabrication is carried out in our workshops under controlled conditions.

4 - Installation of equipment

Equipment is installed and integrated, the plant is tested and prepared for shipping.

5 - Assembly on site

The plant is assembled at final location. Modules are set and internal hook-up performed.

6 - Commissioning & qualification

Site commissioning and qualification IQ and OQ are performed leveraging the work in the workshop.

7 - Client validation activities

The client performs PQ and start-up activities and manufacturing commences, usually 6-12 months earlier than with conventional construction.

8 - Service & support

Start-up/technical assistance, upgrades and modifications are available on request.